Skip to content
Lake and pond expertiseSoftware, monitoring, and consulting
Learning CenterLearning pathsAquatic invasive species prevention and early response
Guided field curriculum · Version 1.0.0

Aquatic Invasive Species: Prevent Spread, Detect Early, Verify Evidence, and Hand Off Response

Build a cross-taxon, authority-first AIS workflow that prevents movement, records a suspected organism without declaring identity, routes current reporting, separates specimens and eDNA from occurrence and establishment, designs bounded surveillance, applies only adopted biosecurity protocols, governs rapid-response alternatives, and verifies long-term outcomes.

For
Lake and reservoir managers, Tribes, municipalities, natural-resource agencies, lake associations, marinas, utilities, consultants, watercraft-inspection programs, laboratories, field crews, and community monitoring coordinators
Field stops
12
Reading + practice
About 420 minutes
Review status
Controlled preview
Completion evidence

Finish with a field-ready draft, not a badge.

A current authority and pathway map, prevention briefing, suspected-observation package, reporting handoff, plant-versus-animal evidence route, bounded animal-surveillance design, specimen/eDNA validation map, occurrence/status evidence ledger, equipment-movement record, rapid-response readiness matrix, alternatives and authorization register, and governed prevention-detection-response record with effectiveness and correction plan.

Before you begin

Bring current Tribal, state, territorial, federal, local, landowner, wildlife, waterbody, pesticide, waste, protected-resource, and safety contacts; adopted AIS, HACCP/biosecurity, inspection, decontamination, reporting, specimen, laboratory, privacy, and rapid-response procedures; pathway and asset inventories; current watchlists; and any existing observations, reports, specimens, eDNA results, occurrence records, and authorizations.

Continue the work

Field route

Use an authored handoff; this is not an automatic recommendation or approval.

Shared route boundary

Does not supply a decontamination protocol or recipe; determine species or status; establish compliance, clearance, safety, cleanliness, or AIS-free condition; or authorize movement, fieldwork, waste handling, or response.

Your private browser evidence record0 of 12 field stops marked complete

Loading local progress…

  1. Decide · 28 minutes

    Route active hazards and map decision authority

    Pause AIS work when an active exposure, hazardous substance, unsafe site, animal or human illness, fish mortality, or other urgent condition requires emergency or responsible-authority response; then map who controls observation, reporting, access, specimen handling, status, movement, response, and public communication.

    Field exercise

    Build a jurisdiction-specific card with primary and backup owners for emergency protection, AIS reporting, wildlife, waterbody access, specimen transfer, laboratory evidence, sensitive-location release, and after-hours handoff; run a tabletop without entering water, handling material, or moving equipment.

    Checkpoint

    Would the team protect people and animals first and avoid treating an AIS suspicion as permission to approach, capture, sample, move, clean, treat, or publish?

  2. Understand · 30 minutes

    Inventory introduction pathways, vectors, and protected destinations

    Map watercraft, trailers, bilges, live wells, bait, aquarium release, stocked organisms, canals, floods, field gear, construction equipment, research material, and other locally relevant pathways without converting a pathway screen into proof of introduction or occurrence.

    Field exercise

    Create a source-water-to-destination pathway map with asset IDs, owners, contact-water compartments, movement timing, current controls, unknowns, sensitive destinations, and the controlling plan for every proposed prevention action.

    Checkpoint

    Does the inventory preserve pathway potential, observed movement, introduction evidence, occurrence, and establishment as different states?

  3. Practice · 34 minutes

    Build prevention and field-biosecurity controls

    Connect public prevention, qualified inspection, field HACCP/biosecurity, dedicated equipment, adopted decontamination procedures, waste/rinseate controls, destination requirements, training, and stop-work ownership without inventing universal instructions.

    Field exercise

    Audit one watercraft, one shared field-gear set, and one contractor asset against their current issuer-approved protocols; record exact versions, applicable components, missing scope, exceptions, owners, and movement holds.

    Checkpoint

    Are Clean, Drain, Dry messaging, inspection, protocol completion, destination acceptance, and exact authority release separate records rather than a universal compliance or AIS-free claim?

  4. Document · 32 minutes

    Record and report a suspected organism without declaring an infestation

    Preserve a safe observation, photographs with scale, observable descriptors, method and effort, generalized location, open look-alikes, current reporting channels, case IDs, acknowledgements, and corrections while avoiding unauthorized handling and unsupported identity or status claims.

    Field exercise

    Build two practice packets: a photo-only unknown attached to equipment and an observation with no photograph. Submit neither; instead map the exact current reporting routes, required evidence, privacy controls, open channels, and next owner.

    Checkpoint

    Would a reader understand that an app suggestion, common name, public report, and database record are not qualified identification, verified occurrence, establishment, or legal status?

  5. Decide · 24 minutes

    Route plant evidence and animal evidence to the right methods

    Use the established aquatic-vegetation survey and taxonomic chain for suspected macrophytes while routing fish, mollusks, crustaceans, zooplankton, and other non-plant evidence to the new animal-surveillance method; preserve unknown material when the group itself is unresolved.

    Field exercise

    Sort ten hypothetical observations into plant workflow, animal workflow, unresolved/authority handoff, or active-hazard route and explain what evidence, not confidence or appearance, supports each branch.

    Checkpoint

    Did the branch avoid plant-treatment duplication, unauthorized specimen movement, and the assumption that every unfamiliar organism is nonnative or invasive?

  6. Measure · 40 minutes

    Design bounded aquatic-animal early-detection surveillance

    Define the target taxon and life stage, population and detection unit, pathway/habitat site basis, timing, effort, replication, complementary methods, detection limits, safety, access, and between-site biosecurity for a named decision.

    Field exercise

    Draft a surveillance design for one mollusk or crustacean target with settlement, plankton, visual/specimen, or molecular methods as appropriate; record inaccessible units, controls, detection assumptions, and what a non-detect cannot establish.

    Checkpoint

    Could another qualified team reproduce the frame and effort without reading one season or one method as proof of absence or eradication?

  7. Document · 38 minutes

    Control specimen, eDNA, laboratory, and taxonomic lineage

    Separate authority to collect or transport a specimen from custody and repository evidence; and separate an eDNA sample, assay, controls, detection, validation, and genetic-material interpretation from visual occurrence, live-organism presence, and establishment.

    Field exercise

    Trace one no-specimen observation, one authorized voucher, and one eDNA result through permission, identifiers, labels, transfers, controls, laboratory/identifier, qualification, accepted use, and correction without filling missing evidence from memory.

    Checkpoint

    Are specimen custody and water-sample custody distinct, and does every eDNA statement stop at genetic material unless independent evidence supports another state?

  8. Decide · 34 minutes

    Separate identity, occurrence, establishment, and jurisdictional status

    Reconcile qualified determinations, official occurrence records, metadata limitations, repeated/life-stage evidence, current jurisdictional lists, effective dates, conflicts, and corrections without using database absence as biological absence or nonnative as invasive.

    Field exercise

    Build an evidence-state table for an unverified report, confirmed taxon, eDNA detection, verified occurrence, repeated detection, establishment determination, and current regulated-status source; mark the exact authority, scope, date, and prohibited inference for each.

    Checkpoint

    Can every status claim be traced to a current exact source without collapsing report, identity, occurrence, establishment, harm, origin, and regulation?

  9. Practice · 26 minutes

    Record equipment movement under an adopted protocol

    Preserve source and destination waters, exact-offset use times, asset compartments, protocol issuer/version/scope, user-entered required steps, evidence, exceptions, waste/rinseate disposition, destination review, and exact release ownership without a LakeTech cleaning recipe or clearance claim.

    Field exercise

    Enter a shared sampling asset with one unresolved component and one destination requirement, then show why protocol completion, exception resolution, destination acceptance, and authority release remain different states.

    Checkpoint

    Does missing protocol, scope, required evidence, exception review, destination requirement, or release ownership keep movement on hold?

  10. Practice · 40 minutes

    Prepare rapid-response governance before a detection

    Predefine activation ownership, incident structure, communications, laboratories, qualified teams, equipment, procurement, funding, protected-resource and Tribal consultation, feasibility review, safety, biosecurity, sensitive-data handling, and exercises without treating a plan as action authority.

    Field exercise

    Run a tabletop from suspected observation through authority acknowledgement, verification, delimiting survey, feasibility review, public holding statement, and stop decision; record every unresolved role, resource, and authorization gate.

    Checkpoint

    Would the plan support fast coordination while still preventing a report, positive result, plan, grant, permit application, or urgency from becoming unauthorized action?

  11. Decide · 44 minutes

    Compare response alternatives and preserve authorization boundaries

    Compare no action, monitoring, containment, suppression, eradication, restoration, and pathway controls through feasibility, uncertainty, permits, labels, animal welfare, protected resources, adverse effects, lifecycle resources, and stop criteria; then keep recommendation, authorization, and implementation independently attributable.

    Field exercise

    Create an alternatives register with one no-action branch, one rejected action, one monitoring-only path, one authority-review candidate, exact authorization evidence, an as-built deviation, and an adverse-effect stop trigger.

    Checkpoint

    Are funding, design, permit application, issued permit, label, owner approval, project authorization, implementation, and effectiveness separate evidence states?

  12. Document · 48 minutes

    Complete the governed record and preregister effectiveness

    Preserve observation, movement, report, specimen/eDNA, determination, occurrence, establishment, status, surveillance, biosecurity, response, implementation, long-term management, public release, correction, and effectiveness decisions in one versioned record.

    Field exercise

    Complete a tabletop record with an unknown taxon, no-specimen branch, bounded eDNA non-detect, open report channel, protocol exception, exact movement hold, no-action response branch, generalized public release, and preregistered pathway, population, ecological, and adverse-effect endpoints.

    Checkpoint

    Could an independent reviewer distinguish effort, protocol adherence, detection, occurrence, establishment, implementation, control, restoration, eradication, adverse effect, inconclusive result, and authority-approved public claim?

Learning record

Document what changed in your field plan.

Pathway
Aquatic Invasive Species: Prevent Spread, Detect Early, Verify Evidence, and Hand Off Response
Version
1.0.0
Reviewed
2026-07-15
Next review
2026-10-15
Learner / teamDateReviewer or discussion partner

Completion means the exercises and checkpoints were discussed or documented. It does not certify professional competence, approve a method, or authorize field or management action.